• Menu
  • Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Darling Irrigation

Specialising in water use efficiency and advanced irrigation services

Header Right

AGnVET Group
  • About Us
    • Our History
    • Project Showcase
    • Careers
    • ISO Certification
    • AGnVET Group
  • Rural Irrigation Solutions
    • Livestock & Domestic Water
    • Centre Pivot & Lateral Move Irrigation
      • Zimmatic by Lindsay
    • Drip Irrigation
    • Fertigation & Chemigation
    • Pump Systems
    • Water Troughs & Tanks
    • Remote Water Monitoring
  • Mining & Civil Solutions
    • Civil Water Projects
    • Waste and Stormwater Capture
    • Water Recycling and Drainage
    • Pumping & Filtration Systems
    • Pressurised Water
    • Dust Suppression
  • Services & Maintenance
    • Repairs & Maintenance
    • Design & Installation
    • Consultancy Services
    • Water & Bore Testing
    • Poly Welding
  • Products
    • Irrigation Equipment
    • Poly Pipes & Fittings
    • Water Tanks & Troughs
    • Water Filtration
    • Spinklers & Valves
    • Pumps
    • Water Meters
  • News & Info
    • News & Promotions
    • Social News
    • Project Showcase
    • Resources
    • Expired Promotions
  • Locations
    • Bourke
    • Dubbo
    • Launceston
    • Leeton
    • Narromine
    • Latrobe
    • Rochester
    • Scottsdale
    • Wagga Wagga
  • Contact Us
  • Search
  • About Us
    • Our History
    • Project Showcase
    • Careers
    • ISO Certification
    • AGnVET Group
  • Rural Irrigation Solutions
    • Livestock & Domestic Water
    • Centre Pivot & Lateral Move Irrigation
      • Zimmatic by Lindsay
    • Drip Irrigation
    • Fertigation & Chemigation
    • Pump Systems
    • Water Troughs & Tanks
    • Remote Water Monitoring
  • Mining & Civil Solutions
    • Civil Water Projects
    • Waste and Stormwater Capture
    • Water Recycling and Drainage
    • Pumping & Filtration Systems
    • Pressurised Water
    • Dust Suppression
  • Services & Maintenance
    • Repairs & Maintenance
    • Design & Installation
    • Consultancy Services
    • Water & Bore Testing
    • Poly Welding
  • Products
    • Irrigation Equipment
    • Poly Pipes & Fittings
    • Water Tanks & Troughs
    • Water Filtration
    • Spinklers & Valves
    • Pumps
    • Water Meters
  • News & Info
    • News & Promotions
    • Social News
    • Project Showcase
    • Resources
    • Expired Promotions
  • Locations
    • Bourke
    • Dubbo
    • Launceston
    • Leeton
    • Narromine
    • Latrobe
    • Rochester
    • Scottsdale
    • Wagga Wagga
  • Contact Us
  • Search
Darling Irrigation Mining Projects

Solutions for a range of mining projects across eastern Australia

You are here: Home / Project Showcase / Solutions for a range of mining projects across eastern Australia

Darling Irrigation specialises in water use efficiency and offers extensive hydraulic capabilities for the mining industry across Australia. Below are a few projects Darling Irrigation has been involved with.

Tailings dam plumbing – Eastern Star Gas, Narrabri

Eastern Star Gas required the construction of adequate plumbing to a tailings dam in the Pilliga Forrest near Narrabri and engaged Darling Irrigation for the job.

Darling Irrigation undertook the following activities:

  • Pipeline installation
  • Poly manifold fabrication
  • Entry and exit pipework at Tailings Dam
  • Valving
  • Quick coupling connections

During the project, Darling Irrigation was also able to ensure a certified occupational health and safety and quality system, licensed poly welding and provide a State Water Accredited Water Meter Installer.

The outcome of the project was a lined tailings dam with poly manifolds and valves to enable safe storage of tailings water.

Bore water supply project – Endeavour Mine, Cobar

The Endeavour Mine engaged Darling Irrigation to provide 10l/s flowrate to one of the mine site processing plants, in an area with very little groundwater resource and low permeability rock layers. Darling Irrigation’s solution revolved around groundwater extraction from a number of boreholes, linked to provide a cumulative required flow and involved the following activities:

  • Pipeline installation to complete network piping
  • Bore testing and maximum yield analysis
  • Sensitivity analysis on affect to overall groundwater table

This successful project resulted in Endeavour Mine having sufficient water to processing units and production maintained.

Previous Post: «darling-Irrigation-broken-hill-storm-water-capture-case-study Improving water use efficiency through storm water capture and reuse
Next Post: Forbes Golf Association »

Footer

  • Rural Irrigation Solutions
  • Drip Irrigation
  • Fertigation & Chemigation
  • Centre Pivot & Lateral Move Irrigation
  • Pump Systems
  • Remote Water Monitoring
  • Livestock & Domestic Water
  • Water Troughs & Tanks
  • Mining & Civil Solutions
  • Dust Suppression
  • Pressurised Water
  • Pumping & Filtration Systems
  • Waste and Stormwater Capture
  • Water Recycling and Drainage
  • Services & Maintenance
  • Consultancy Services
  • Poly Welding
  • Repairs & Maintenance
  • Design & Installation
  • Water & Bore Testing
  • Irrigation Products & Equipment
  • Irrigation Equipment and Parts
  • Poly Pipes & Fittings
  • Pumps
  • Spinklers & Valves
  • Water Filtration
  • Water Meters
  • Water Tanks & Troughs
  • News & Promotions
  • Social News
  • Project Showcase
  • Resources
  • Locations
  • Bourke
  • Narromine
  • Dubbo
  • Wagga Wagga
  • Rochester
  • Scottsdale
  • Launceston
  • About Us
  • Careers
  • ISO Certification
  • Scam Alerts
  • Contact Us

Copyright © 2025 | Darling Irrigation | ABN 91 087 675 465 | Privacy Policy | Terms of Use | Log in